Category 162
Discussion List
-
Why supplies and demands suggested due date is earlier than need by date?Summary: Why in Supplies and Demands supply order's "Suggested Due Date" is preloading 6 months before its demand's "need by date"? Constrained Plan Content (please ensu…Catherine Alequin 88 views 6 comments 0 points Most recent by Catherine Alequin Supply Chain Planning and Collaboration
-
About the date calculation logicSummary: The dates seen on the Demand Fulfilment screen include Material Available Date and Expedite Date. What calculation logic is used to calculate these dates? Conte…Eric Lee 31 views 5 comments 0 points Most recent by Eric Lee Supply Chain Planning and Collaboration
-
Constraint Plan - why There is Demand unmet for FG even when cumulative total is .5 daysSummary: Team, we are using constraint plan. WE booked certain Sales orders however there is no planned order. WE are not using forecast. All sales order with 1 quantity…Rachit5 21 views 1 comment 0 points Most recent by Avinash Erande Supply Chain Planning and Collaboration
-
How to enable the measure Gross Requirements in supply plan tables like Material PlanSummary: We are unable to find the measure Gross Requirements to add to our custom Material Plan tables . Content (required): Does the measure Gross Requirements exist t…Rahul A 61 views 4 comments 0 points Most recent by Avinash Erande Supply Chain Planning and Collaboration
-
Plan suggested sequence should based on shortest change over time.Summary:Plan suggested sequence should based on shortest change over time. Example - Product A cannot be produced immediately after product B whereas product B can be pr…Priyank R Khare 31 views 1 comment 0 points Most recent by Avinash Erande Supply Chain Planning and Collaboration
-
Can supply planning consider resource constraint when 2 products cannot be produced togetherCan supply planning consider resource constraint when 2 products cannot be produced together Example - Product A and B cannot be stored together. If 4 Lt. of Product A i…Priyank R Khare 31 views 2 comments 0 points Most recent by Avinash Erande Supply Chain Planning and Collaboration
-
shipments Forecast measure has disaggregation measure as Shipments History AverageSummary: How is forecast getting disaggregated generated based on this.? Shipments Forecasting Level is 3 for items. what is impact of Shipments History Average on its S…SARTHAK GOSWAMI 1 view 1 comment 0 points Most recent by Thejaswini Kamreddy-Oracle Supply Chain Planning and Collaboration
-
Ability to load Plan-Specific Safety Stock Values through FBDIHi, We need to load the safety stock levels FBDI twice in the environment for a different set of items in each of it. Currently, one round of FBDI load is being done in …Kowsambi Komaravolu 21 views 2 comments 0 points Most recent by Kowsambi Komaravolu Supply Chain Planning and Collaboration
-
PO created with request source as Oracle fusion Planning centralSummary: we see some PO's created for few items in SCO with request source as Oracle fusion Planning central. there is only Transfer type sourcing rule for these items. …SARTHAK GOSWAMI 22 views 4 comments 0 points Most recent by SARTHAK GOSWAMI Supply Chain Planning and Collaboration
-
After automated hyperparameter tuning, which measure to be used for MAPE.?Summary: Should, Shipments Forecast: Tuned Best MAPE be used rather than Shipments Forecast :MAPE ? Content (please ensure you mask any confidential information): Versio…SARTHAK GOSWAMI 12 views 2 comments 0 points Most recent by SARTHAK GOSWAMI Supply Chain Planning and Collaboration
-
Can Tuned Best MAPE be used as mark of forecast accuracy.?Summary: Can Tuned Best MAPE be used as mark of forecast accuracy and be taken as new improved MAPE instead of Shipments Forecast MAPE measure.? Content (please ensure y…SARTHAK GOSWAMI 11 views 1 comment 0 points Most recent by Thejaswini Kamreddy-Oracle Supply Chain Planning and Collaboration
-
Forecast spreading for last planning bucketSummary: Forecast spreading from month level forecast to weekly supply plan in last week planning bucket is not working as expected Content (please ensure you mask any c…Avinash Erande 11 views 2 comments 0 points Most recent by Avinash Erande Supply Chain Planning and Collaboration
-
Supply planning consider resources "Assets" Downtime in Maintenance (Preventive Maintenance)Does the supply planning consider the expected downtime that the work definition needs for preventive maintenance?Mina Lotfy 11 views 1 comment 1 point Most recent by Nitin.Joshi Supply Chain Planning and Collaboration
-
FBDI uploaded SS value is carried from previous week&copied to the remaining buckets of MaterialPlanWe have uploaded time-phased safety stock values through FBDI for the item-orgs whose 'Safety Stock Planning Method' attribute has been changed to 'Safety Stock Quantity…Kowsambi Komaravolu 21 views 3 comments 0 points Most recent by Kowsambi Komaravolu Supply Chain Planning and Collaboration
-
why does forecasting method keeps changing from Naive to Holt Naive and then back to Naive.?Summary: While reviewing the forecast for an item in the months of June and July the forecast method changes from Naive to Holt Naive back to Naive. what shall be reason…SARTHAK GOSWAMI 11 views 1 comment 0 points Most recent by Thejaswini Kamreddy-Oracle Supply Chain Planning and Collaboration
-
Does Oracle updates "Schedule ship date" of sales order when it is firmed with new date in planning?I have a sales order demand showing in planning and I firmed it with a new date, on release that sales order from planning (Supplies and demands screen), I expected that…Raju Pachigolla 71 views 6 comments 0 points Most recent by MMA27305 Supply Chain Planning and Collaboration
-
Is possible to Overwrite collected On-hand in supply plan and re-run MRP easily?Is possible to Overwrite collected On-hand in supply plan and re-run MRP easily?Tian Chen-Oracle 21 views 5 comments 0 points Most recent by Vatsala Bharadwaj Supply Chain Planning and Collaboration
-
List Price field is not available in Planning Supplies and Demand TableSummary: List Price field is not available in Supply Planning, in Supplies and Demand Table (even in Manage Columns) we have a requirement to add the list price in Suppl…Devivaraprasad Panda-Oracle 21 views 2 comments 0 points Most recent by Devivaraprasad Panda-Oracle Supply Chain Planning and Collaboration
-
Excess Planned Order getting generated for an Unconstrained Plan even though On Hand is availableSummary: Excess Planned Order getting generated for an Unconstrained Plan even though On Hand is available Content (please ensure you mask any confidential information):…AJSS007 51 views 9 comments 0 points Most recent by Thierry Lamote Supply Chain Planning and Collaboration
-
Decimal values in Item with Shortage exceptionHi Everyone, We are using Unconstrained plan in which we are seeing the shortage quantities as decimal quantities in Item with Shortage Exception, we tried to search for…Veera Navyakanth 21 views 2 comments 0 points Most recent by Satwik Kumar Patel-Oracle Supply Chain Planning and Collaboration
-
Different work-centers under same organization has different shifts. Unable to add multiple shifts.Current condition : "As of now, only 2 shifts are available for one WorkCentre - "one user-defined shift" and "24 hours shift". We can change shift by adding resource ex…
-
Time horizon of Demand "Item Lead Time" in Replenishment planningHi, We are using Min-Max Policy Planning, with Safety Stock as SL based. For Average Daily Demand, we are using Forecast. Now Min qty is calculated as Demand During Lead…Appala Raju Kanumuri 61 views 5 comments 1 point Most recent by Jayesh Agrawal-Oracle Supply Chain Planning and Collaboration
-
How to make Shipments Forecast Tuned: Best MAPE as Shipments Forecast MAPESummary: I kept sample percent 50, which means after 2 runs all of data will be covered for hyperparamter tuning. i did the 2 runs. keeping nodal tuning value as 2 and o…SARTHAK GOSWAMI 31 views 2 comments 0 points Most recent by SARTHAK GOSWAMI Supply Chain Planning and Collaboration
-
Supply plan is recommending cancellation of Purchase Orders and is suggesting to create new POsSummary: In Supply Plan output, - when the demand is cancelled in a week, - there is a demand in the next week and - there are open POs due three weeks later, system is …Suresh Kanukollu 41 views 10 comments 0 points Most recent by Satwik Kumar Patel-Oracle Supply Chain Planning and Collaboration
-
How to update Scheduled Ship Date From PlanningSummary: Business requirement is that planners who do not have access to the sales order UI should be able to update the schedule ship date depending on the changes (man…Saroj Maharana 31 views 2 comments 0 points Most recent by Uttam Eitha Supply Chain Planning and Collaboration
-
Planned order start time calculationQ1. In supply planning work area, planned order start date is shown and not the start time. But in production scheduling work area when we map a supply plan to productio…Raghu Sodanapally 21 views 1 comment 0 points Most recent by M. Bolsinger-Oracle Supply Chain Planning and Collaboration
-
How to restrict to submit Movement request if Onhand Leass than the Required QtySummary: Currently users are able to create Movement request for those items having no on hand or less than required Qty . Need help how to restrict user by page compose…Kailash Joshi 11 views 1 comment 0 points Most recent by Scott Malcolm-Oracle Supply Chain Planning and Collaboration
-
which cost book supply planning collects like Primary, Secondary, and Reporting etcSummary: which cost book supply planning collects like Primary, Secondary, and Reporting etc Content (please ensure you mask any confidential information): Version (incl…Devivaraprasad Panda-Oracle 11 views 1 comment 0 points Most recent by Devivaraprasad Panda-Oracle Supply Chain Planning and Collaboration
-
Attribute-Based Constrained Planning | Attribute should flow from Planning to Procurement.Plan type - Constrained Supply Plan Requirement - Client wants demand and supply to be connected using the same identifier or sequence number. So we have created an attr…
-
Plan order use earliest start date in resource plan instead of suggested start dateSummary: Our client is using process manufacturing and they don't stop manufacturing unless absolutely have to (scheduled maintenance or running out of space to store FG…KKZ 111 views 14 comments 0 points Most recent by Kevin Elder -Oracle Supply Chain Planning and Collaboration