Can we use any oracle demand management forecasting methods for Maintenace spare parts forecast?Summary: Content (required): we have a demand planning with maintenance modules, and we need to use the forecasting method to generate forecast for spare parts based on …Hassan Saeed 61 views 3 comments 0 points Most recent by Hassan Saeed Supply Chain Planning and Collaboration
-
ASN cancellation not reflecting in PlanningSummary: ASN cancellation Content (required): Hi Team, There is PO of 60 qty.. Now user created ASN for remaining 60. For 60 qty ASN, user received 59 quantity and then …
-
Is it possible to load User-defined Hierarchy for Supplier Dimension in Oracle Fusion S&OP Cloud?Summary: Content (required): Version (include the version you are using, if applicable): Code Snippet (add any code snippets that support your topic, if applicable):Ashish Omar 31 views 2 comments 0 points Most recent by Ashish Omar Supply Chain Planning and Collaboration
-
Does Planning support a monthly quarterly type in the calendar?Summary: Forecast is reflecting in earlier period than what it is loaded. Content (required): Hi All, Users are loading forecast for 1st september in monthly bucket and …Rachit5 71 views 3 comments 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
Which release will bring in supplier capacity constrained supply plan functionality to Oracle cloud?Summary: Currently, constrained supply plan does not respect supply capacity as hard constraint, overloads it based on planned order quantity when planned order quantity…d.ac.singh 21 views 2 comments 0 points Most recent by d.ac.singh Supply Chain Planning and Collaboration
-
How to configure the customer dimension attributes?Summary: I am trying to configure the customer dimension attributes but i am not seeing any attribute column in the csv files. Provide the exact steps used to encounter …Ravi Awasthi 31 views 1 comment 0 points Most recent by Raj C -Oracle Supply Chain Planning and Collaboration
-
is the bill of resource can have more than 1 assigned units ?Summary: In the Cloud Sales and operation planning, i setup the aggregate bill of resource. So here is the question "is the bill of resource can have more than 1 assigne…Ravi Awasthi 31 views 1 comment 0 points Most recent by Ashish Omar Supply Chain Planning and Collaboration
-
Is there a way to auto consolidate multiple planned order recommendations?Summary: Content (required): Hi all, Please let me know if anyone has information related to the below issue. in the planning workbench,currently we can see mutiple plan…BhargavC 101 views 8 comments 0 points Most recent by Victor Martin Supply Chain Planning and Collaboration
-
ESS Job ParameterSummary: We need to automate the below ESS jobs using the Integration layer, when we run these jobs from the application it's internally passing a few ID parameters. We …Harish Gundre 31 views 1 comment 0 points Most recent by Raj C -Oracle Supply Chain Planning and Collaboration
-
Required API and parameters to override ship-from attrib. for selected SO line in bulkSummary: Seeking for help to understand what API's and parameters are required to bulk-update/nullify the requested ship-from attribute across thousands of order lines i…Rajesh Kenchi 41 views 2 comments 0 points Most recent by Alex D-Oracle Supply Chain Planning and Collaboration
-
Collecting Purchase Orders Shipments Receipts HistoryHi All, I see newly introduced Supply entity while Collecting Planning Data. I dont see any reference link explaning why it is introduced and how it was working before. …Vikash Tiwary 173 views 4 comments 1 point Most recent by Vikash Tiwary Supply Chain Planning and Collaboration
-
what does Perform Collections Postprocess Actions do as part of Collection Job set?Hi Team, We are running Collection Jb Set in Targeted mode. Can anyone help me understand what "Perform Collections Postprocess Actions" do as part of Collection Job Set…Vikash Tiwary 41 views 1 comment 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
Archiving measures ... and restoringSummary: Newbe in SCM tech. Hi, please, could someone provide info. about archive process, I cannot find where the backup files would be stored and how to restore data f…Juan Jesus 61 views 3 comments 0 points Most recent by NinaLyubenova-Oracle Supply Chain Planning and Collaboration
-
Approach for loading Oracle Cloud Release Plan recommendation to Oracle EBS ApplicationSummary: Business wants to load release plan recommendation from Oracle Cloud to Oracle EBS application. Considering the requirement we followed Oracle recommended Appro…Sunil Aggarwal 21 views 1 comment 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
How does the forecast explosion works for ATO item?Summary: We have one ATO item , the structure is as below: Finished Good Level 1 Part 1 Level 1.1 Part A Level 1.1 Part B Level 1 Part 2 In the above case if we load the…Sumit_99 31 views 1 comment 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
How to analyze Forecast Consumption?Summary: **This post was created as part of a How to Service Request (SR)** After a supply plan is run, how to analyze forecast consumption for an item that has Gross Fo…NinaLyubenova-Oracle 71 views 5 comments 0 points Most recent by Vatsala Bharadwaj-Oracle Supply Chain Planning and Collaboration
-
Question on Lead timeSummary: Content (required): Hello Experts, If for 1 EACH of an Top level assembly Make Item, we define a 0.5 day pre-processing lead time – is that applied as a fixed 0…Ashish_Kumar 41 views 2 comments 0 points Most recent by Vatsala Bharadwaj-Oracle Supply Chain Planning and Collaboration
-
How do I split forecast demand for One item across two mfg lines in the same plant?Summary: Supply Planning -- During ramp up times for new items we need to manufacture the same item on more than one line but not take up 100% of each lines capacity/ava…Diana Harvison 82 views 4 comments 0 points Most recent by Scott Malcolm-Oracle Supply Chain Planning and Collaboration
-
External forecast uploaded on weekly bucket ignored when first day of the week is off periodSummary: External forecasts are uploaded on weekly basis. They are ignored when the first day of the week is off period. Content (required): Our customer uploads externa…Alexandre Chea-Oracle 61 views 4 comments 0 points Most recent by Alexandre Chea-Oracle Supply Chain Planning and Collaboration
-
Loading the Adjusted Production Plan measure through Measures Template and simulate..Summary: HI, We want to load the Adjusted Production Plan measure through the template - ScpMeasuresImportTemplate, data is coming from legacy system and we want S&OP to…sanjiiv.chavaan 51 views 2 comments 0 points Most recent by Kevin Elder -Oracle Supply Chain Planning and Collaboration
-
Disaggregation of Shipments Forecast to other dimensionsSummary: How the shipments forecast gets disaggregate to other measure dimensions. Content (required): We understand that forecast is generated by demand engine per fore…Avinash Erande 71 views 1 comment 0 points Most recent by DMC_PM-Oracle Supply Chain Planning and Collaboration
-
Oracle named a Leader in the 2023 Gartner® Magic Quadrant™ for Supply Chain Planning SolutionsNew Gartner® Magic Quadrant™ for Supply Chain Planning Solutions report now available We are thrilled that Oracle has been named a Leader in Gartner® 2023 Magic Quadrant…Jill Manning-Oracle 171 views 7 comments 4 points Most recent by RakeshOracle-Oracle Supply Chain Planning and Collaboration
-
Demand Management number of Layout and tablesSummary: Is there any limitation, specially on performance on the number of Layouts and tables that can be created? Content (required): Version (include the version you …Rocio Barreras-Oracle 51 views 5 comments 0 points Most recent by Satwik Kumar Patel-Oracle Supply Chain Planning and Collaboration
-
How to create Work Order from a Constrained Plan with DFF automatically populated by the plan?Summary: Is it possible to create Work Order from a Constrained Plan (by realising Planned Orders) with some WO's DFF automatically populated base on the Output Item of …Federico Marucci 51 views 1 comment 0 points Most recent by Aniket_D Supply Chain Planning and Collaboration
-
How to decide the planning method for an item?Summary: How to decide which planning method is most suitable for an item? Content (required): In fusion Planning specification tab there are several planning methods av…Sumit_99 421 views 7 comments 0 points Most recent by NinaLyubenova-Oracle Supply Chain Planning and Collaboration
-
Supplier capacity Constraint not getting enforced in PlanSummary: Supplier capacity Constraint not getting enforced in constraint supply Plan Content (required): We have defined a constraint Plan and enforced the supplier capa…Pradeep kudale 121 views 17 comments 0 points Most recent by DhirajRathi Supply Chain Planning and Collaboration
-
Migrate your Project-Driven Plans to the Next-Generation Attribute-Based Planning Framework in 22BDetails : In Supply Planning Cloud, Project-Driven Supply Chain (PDSC) planning allows you to match up supplies and demands across the supply chain by project and task. …Vijay Pillarisetti-Oracle 271 views 9 comments 3 points Most recent by Aniket_D Supply Chain Planning and Collaboration
-
Safety Stock Quantity in the Items table in supply planSummary: There is a field called safety stock quantity when we open the Items table in supply plan. What is this for? When we load safety stock using FBDI this field doe…
-
Supply Plan ignores forecastSummary: We have loaded forecast using FBDI into planning and can see the forecast in plan inputs screen but when supply plan is run it is not picking up this forecast. …Rahul A 51 views 2 comments 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration