In Oracle Cloud Manufacturing, Can we created resources with UOM other than Hour ?Can we create resources with UOM other than Hour ?? And what are the steps to follow if we go for any other unit of measure? Where can we set? Thanks, Rufia
-
How to check audit log for work definitionHi, in manage audit policy, i have enable audit for WD but don't know where to view or trace the record
-
Default value for subtype field in work orderSummary: In the work order we have the subtype field, it is possible to take a default value depending on the item category or type work order Content (please ensure you…
-
Has anyone configured a resource in Manufacturing to be based on Piece Rate?Summary: Have a requirement where the Resources in Manufacturing are costed using a Piece Rate, but in the Work Definition we still need to account for the time it shoul…
-
Manage Work Definition in the Spreadsheet is not supporting Outside Operation Supplier updateSummary: Manage work definitions in the spreadsheet is not allowing us to remove supplier name and site for an outside operation. Content (please ensure you mask any con…
-
Control who can add ad-hoc items to work orderSummary: We have certain operators that we don't want to be able to add items to a work order or increase the quantity of the component above what is on the item structu…
-
Add shift exception not in LOV to create shift excpetionSummary: Add shift exception not in LOV to create shift excpetion Content (please ensure you mask any confidential information): Add shift exception not in LOV to create…
-
how to access the plan to produce infoletSummary: How to access the plan to produce infolet. When logged into the mobile app, the business doesnot see any infolets for them to choose. Content (please ensure you…
-
Material Assignments UOM different from Work Order's UOMSummary: Material Assignment's UOM is different from Work Orders' UOM Content (please ensure you mask any confidential information): The Material Assignments UI shows th…
-
In Production Scheduling, how to keep track of Original Work Order Completion Dates?In Production Scheduling, Finite Scheduler can alter the completion dates of Work Orders based on the requirement. Is there a way to have an audit trail to keep track of…SidSaxena 21 views 1 comment 0 points Most recent by M. Bolsinger-Oracle Supply Chain Planning and Collaboration
-
In Production Scheduling, is there a way to color code the MTO WOs and MTS WOsIn Production Scheduling, kindly let me know if it's possible to color code Make to Stock Work Orders in one color and Make to Order Work Orders in different color. If y…SidSaxena 21 views 1 comment 0 points Most recent by M. Bolsinger-Oracle Supply Chain Planning and Collaboration
-
Make to Stock white paper in oracle fusionSummary: Hi Team, Could you please provide me the Configuration and Transactional document for MTS(Make to Stock) in oracle fusion Manufacturing and also guide me how th…
-
FIND_NUMBER in 24A Work Definition FBDISummary: What is a significance of newly provided field: FIND_NUMBER (sheet: Operation Items - Standard) into 24A Work Definitions FBDI. What if we don't provide value t…
-
Automatically transfer Order creation from the manufacturing work OrderSummary: When the Work order is Released if the on-hand stock is not available it should create automatic transfer Order from one Inventory Org to another inventory Org.…
-
Transform work order costing for average costsSummary: Customer Nova is a high tech manufacturer and they have a concern around the impact of transform work orders on average costing. Scenario: In inventory they wil…
-
Reports and Analytics AccessSummary: Production Supervisor Role unable to see Reports and Analytics under tools Content (please ensure you mask any confidential information): Production Supervisor …AShekhar 31 views 3 comments 0 points Most recent by Praveen Kumar Akkala-Oracle Reporting and Analytics for SCM
-
In Production Scheduling, how to prevent Reschedule in and out for Work Orders and Resources?In Production Scheduling, kindly let me know If there is a way that can either prevent the Finite Scheduler from Rescheduling in/out a particular Work Order or Resource …SidSaxena 21 views 1 comment 0 points Most recent by Basab Roy-Oracle Supply Chain Planning and Collaboration
-
Is there any REST API using which we can do import process of work definition as we do for FBDIIs there any REST API or SOAP UI using which we can do import process of work definition as we do for FBDI, mass uploading of work definitions
-
OSP Requisitions approval statusSummary: Is there anyway to create OSP requisitions in unapproved status similar to MIN-MAX requisitions? Customer NOVA wants to be able to add information to OSP requis…
-
Planned Work order does not have any operationSummary: Releasing a planned order is resulting in a Work order with no operations on it, even when the Work Definition has the Operations defined along with items and r…
-
Automatically charging the material in Process Manufacturing Work Order upon Work Order CompletionSummary: Automatically charging the material in Process Manufacturing Work Order upon Work Order Completion Content (please ensure you mask any confidential information)…
-
Complete work order with zero quantitySummary: Hello All, we have requirement to complete the work order with zero production quantity, but there are some ingredients are used like utilities etc.. due to som…
-
How to add Batch quanity in Work DefinitionHi, We have more than 3000 work definitions in our application. means that for each and every work definition, we must add the batch quantity. is there any methods or sp…
-
What does the start and stop operation column and buttons do?Where can I find information about the icons highlighted in the above image. I believe the are for starting and stopping an operation time clock.
-
WHEN CANCELING AN OSP ORDER SYSTEM DOESN´T CANCEL PO AND REQUISITIONSummary: If I cancel an OSP maintenace order that has a purchase order automaticaly generated, this PO and its purchase rquistion should be cancelled If not how to cance…
-
How to set Notifications for Work Definition Version changeSummary: How to set Notifications for Work Definition Version change Content (please ensure you mask any confidential information): How to set Notifications for Work Def…
-
Where to capture Resource Process ParametersSummary: My client is in Process Manufacturing and moving from EBS to Fusion. In EBS, in resource process parameter form (Recipe>Routing>Operation>Activity>Resource>Proc…
-
Unable to Change Item structure from Primary to Other in Work DefInitionSummary For an ATO Model Unable to Change Item structure from Primary to Other in Work DefInition Content (please ensure you mask any confidential information): I am una…Meera K Ganapathy-Oracle 11 views 4 comments 0 points Most recent by Meera K Ganapathy-Oracle Manufacturing