Category 164
Discussion List
-
Adding Cross referenced Item to the Work order material transaction.Summary: When adding items to the work order material transaction, we would like to add an item with an item cross reference to be able to select the other part number o…
-
Unable to find the Disabled flag in Maintenance Management - Forecast Real Time Subject areaSummary: Hi All, I have been using "Maintenance Management - Forecast Real Time" to create an OTBI analysis to display forecast details of maintenance programs and relat…
-
Is it possible to Add Sub Operations and Sub Resource to Work OrdersSummary: Client are requesting if it is possible to add a sub operations and sub Resources to the different operations in a work order Content (required): Client are req…
-
Maintenance - Warranty ContractsI can't create a contract manually. When trying to locate the 'Asset Number,' the asset I'm trying to add doesn't appear. The 'Coverage Name' field shows up normally. Ar…
-
PM Due DateSummary: Is there any setup which will let user decide if the PM Generated Work Order will be Forward Scheduled or Backward Scheduled? Can we setup some PM Work Order to…
-
Do you convert on hand quantity of asset items?Summary: Need to determine if converting on hand quantity of maintenance items is necessary before converting them to assets. Content (required): For maintenance asset i…
-
Unable to delete Install Base recordsSummary: We've few records in Install Base, we want to delete those records but we couldn’t find any way to delete those records. Content (required): We've tried to dele…
-
Is it possible to make this Work Request Number DFF field in a Work Order hyperlinkSummary: Is it possible to make this Work Request number DFF field in a work order hyperlinked so that when you click on the hyperlinked Work Request Number, it should r…
-
How to Bulk Assign Assets to a New Meter Template?Summary: Create a new meter template for a new maintenance need. Potentially hundreds of assets that would use the new meter. How would one assign those specific assets …
-
"Add to Favorites" is not working as expected for OTBI reportsSummary: Hi When I add a OTBI report(having input parameters) to Favorites, the output resulting from favorite displays the output without asking for input parameters. I…
-
Is it possible to load via FBDI or other means for Asset Failure Sets?Is it possible to load via FBDI or other means for Asset Failure Sets?
-
Capture FailureWhen trying to capture a failure, in the header we have the field “Asse tis down” Yes/No. Does this field have any action on the asset? Or is it just for control? In thi…Raul Cesar Bezerra Vasconcelos 13 views 1 comment 0 points Most recent by SRGogula-Oracle Maintenance
-
How to disable On Hold status work order option in system?Summary: Hello Team, The users are keeping their work orders On Hold unnecessarily. Here, On hold status is located in two screens. Main Screen (Mass action) Specific wo…
-
Is it possible to review Maintenance Costs at the Parent Asset Level?Summary: I have a virtual Parent Asset called Line 1, beneath that I have 4 different maintainable assets. Looking for the ability to review maintenance costs at the vir…
-
What will be the expression to calculate duration between two timestamps ?Summary: While Creating the Downtime Custom Page using Application Composer, a field named "Calculated Duration" is defined with data type as "Formula". So, an EL Expres…
-
Cannot be able to use the substitute items in the maintenance work orderSummary: We need to use the substitute items in the maintenance work order Content (required): Cannot be able to use the substitute items in the maintenance work order V…
-
unable to consider the substitute items in the maintenance work order Printable View UpdateSummary: Hello, In line with the subject line, we are facing a issue where we have provided the substitute items in the Product Information management agains the spares/…
-
Need Reports and Analytics link to the Maintenance Management that allows quick access to reportSummary: We need to create a shortcut in the maintenance module that allows quick access to maintenance reports. We have the same for PIM module as well as Inventory Mod…
-
How are the Resources Sorted when selecting on a WO operation?Summary: Hi Experts, Just wanted to understand how are the resources Sorted in the picker when trying to assign resource to an operation? Every user see the list sorted …
-
How can we track Internal Assets?Summary: We would like to track and maintain Assets which are transferred internally between BU via Transfer Orders. Content (required): Assets are automatically created…
-
How can I define that number of child assets using a BOM explosion method will be as item numberSummary: The system automatically generates a number that starts with 10000000 Is it possible to define that a logical asset number will be the same as an item number? A…
-
Hi, How to create asset hierarchy for Installed base assets using FBDI without exploding BOM?Summary: Need to create asset hierarchy without "Use BOM as initial hierarchy Flag" using FBDI Content (required): We need to migrate legacy data wherein we can link chi…
-
How to inactivate an Item in Product ManagementSummary: How to inactivate an Item in Product Management Content (required): How to inactivate an Item in Product Management. We need to inactivate Item/Product so that …
-
How to restrict reopening of closed status work order option in system?Summary: Hello Team, The users are reopening their closed work orders and changing their status to unreleased or released status and issuing materials against the existi…
-
Add customised "Repair transaction code" during maintenance WO executionSummary: In fusion, how to add customised "Repair transaction code" LOV's during maintenance WO execution.Shyam Ganesh Parthasarathi-Oracle 71 views 2 comments 0 points Most recent by Shyam Ganesh Parthasarathi-Oracle Maintenance
-
work order project-driven picking from project without taskSummary: Hello, We have enabled project-driven and we want to use project on work orders. on the work order and on the purchase order we need to specify the project and …
-
How to add search criteria based on DFF ?Summary:How to add search criteria based on DFF ? Content (required): Version (include the version you are using, if applicable): Code Snippet (add any code snippets tha…
-
How to trim leading and trailing spaces in a text fieldSummary: How to trim leading and trailing spaces in a text field Content (required): The use case is to trim leading spaces in "Asset Number" field. When the user enters…
-
Is It Possible To Add A Row Count On Maintenance Work OrdersSummary: Just wondering if it is possible to add a row count on the Maintenance Work Order screen? Content (required): Just wondering if it is possible to add a row coun…
-
OTL and project-driven maintenance work ordersSummary: Hi, We are looking to push the information related to the time taken by the resource (labor) against the project -driven work order from Oracle Maintenance Clou…