Hey all,
Trying to figure out the best way to handle a product rework on serialized inventory. I'll give an example.
We get a product "widget" back from the customer on a return, we then need to take a circuit board out of widget and send it for rework (offsite), the circuit board returns and we rework the product as a "B" stock product (basically a refurb and it would be sold as "widget (B)") and have it for sale.
Currently, The only known way we know how to do this process is to receive the product as an A stock so that we capture the average cost/value of this product, unbuild the product, move that part to an offsite bin, do a rework work order on that component, and then rebuild the product. This has several big issues for me. First, since the widget's don't always come back complete from the customer, it means that we will show inventory for components we don't physically have, so this means I complete one work order to rebuild the widget, consuming inventory that doesn't exist, but also means I must make a second work order to consume things like a new box to put it in for example. Second, we lose tracking on the serialized inventory if we do an unbuild, so the history becomes very messy.
So my question is does anyone have a better way to achieve the above? Basically, just need to be able to pull a component out of the widget and be able to show movement to different bins to track it, do a work order on it, and then consume it back into the widget.
Thanks in advance,
John