My Stuff
Comments
-
Right, or assign LPN# before picking/shipping occurs.
-
Please see below:
-
Hello Herdi, I believe it's the mobile scanner create LPN Feature. Is there any documentation for setup? I am getting an error.
-
-
I can enter it manually by lot, but would like it to auto populate based on the lot being recorded on the work order completion:
-
Hello Herdi, I am trying to create a pallet label when finished goods are completed from a work order. Example: I have entered 9 completions with their own lot #. (9 Rolls) I would like to scan all 9 lots and generate a pallet label noting all 9,item number, UOM and total quantity. I would want to add other lots to this at…
-
Since you can test by lot, Is there a way for the Lot number to show on the tablet screen?
-
Looks like you can!
-
Thank you very much Herdi, If it's not possible, do you have any suggestions? Maybe I could create a custom sublist on a custom tab on the WO to collect the data?
-
I greatly appreciate you taking the time to walk me through this. You have been a huge help.
-
Hello Herdi, I guess I wouldn't need the roll unit of measure as long as I can assign a lot code to a specific quantity of square meters like The inventory Detail of the assembly will be configured as follows: Lot1 > Quantity of 250 square meters Lot2 > Quantity of 250 square meters I can assign a lot to any quantity like…
-
I think this will Work! To be able to assign specifically how many square meters per lot (roll) is exactly what I need.
-
Square meters is the finished good unit. The selling unit will be in sq meters. We need to know how much sq meters are on each role and they can vary a bit as mentioned prior. Stocking unit will be the roll. The roll unit is really only being created to assign the lot code to it and for stocking. But I want each role to…
-
Would this scenario still work if I flipped my base unit to sq meters instead of rolls?
-
Thank you very much for this. I will test this scenario out on my end. I am assuming this will work with Work Order completions just like assembly builds. We are using Advanced Manufacturing and Advanced BOMs. The selling a portion of the lot is really important. Can this work on the completion side? Example: When they…
-
Hello Herdi, We have a process where a master roll is produced in sq meters, let's say 1,750 total. The entire roll is being entered against the work order. That master roll is actually being cut into 7 separate rolls, 250 sq meters each. I need to assign an unique serial number for each individual role, but sell and stock…
-
This is perfect! Thank you so much!!
-
I found the field. How could I combine these 3 formulas into one? A shift: case when (((to_char({custrecordiqf1_startdatetime},'hh24')>= 6) AND (to_char({custrecordiqf1_startdatetime},'hh24')<= 18)) AND ((to_char({custrecordiqf1_startdatetime},'D')>= 1) AND (to_char({custrecordiqf1_startdatetime},'D')<= 3))) OR…
-
Hello Herdi, This is looking at the am planned start and end dates. I need it to look at the production results of the actual recorded start and end dates/times. What fields do I change the formula to, to accommodate that? custeventiqftaskplanstart
-
We're down as well. trying to file a case via phone, but no luck.
-
This is very helpful! One question, is it possible to have a formula Text with Day and time? Example: Shift A = Sunday through Tuesday 6am-6pm and Wednesday 6am to Noon.
-
I sure hope Oracle/Netsuite considers having a serious server backup plan for when these instances occur in the future. Companies can't afford to have instability with their systems and be down for this amount of time. Pretty sure the company I work for will consider a new ERP when the contract expires in a year and I'm…
-
They said they deployed a fix as well. Not working, I can't get in at all now and my users are still unable to process transactions. This is brutal...........
-
So they said they fixed it, but now it's back to broken??? I swear the NA Central center is all messed up. We have had many service interruptions in our first year using Netsuite. When I was a customer on the west coast, we never had this many interruptions. Too small a data center?
-
I wish they would get this resolved soon. We are completely down. Production, Sales, you name it. The status page is not updated either.
-
Yes, Same issues here as well.
-
We're Finally back up!!!
-
We are still down. Is there an ETA for the Midwest accounts?
-
Finally got the postpone notice, but still down..... I really feel Netsuite is getting sloppy on their upgrades. We have had many service interruptions this year.
-
Still down here as well. I sure hope this is corrected soon......