To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Supply Chain Planning
Supply Chain Planning and Collaboration
Discussion List
-
"Manufacturing Attribute Groups" in Production schedulingSummary: Hi All In the Production scheduling, when i click on "Add" icon on the "Manufacturing Attribute Groups" the Pop-up is not showing up to add the further details.… -
Running supply plan results in error because item edited in simulation setHi experts, I have this below error when running supply plan : Item A in IO_A was edited in the attached simulation set Has anyone experienced this error before ? I add … -
How to interpret Forecast Methods Identification when using the Parameter "Mix"?Summary: After running a stat fcst, the Forecasting Methods returned LMR. My assumption is it's Linear Multiple Regression? as there are no letters identifying the model… -
cannot find the Supply Request Reference Number for plan order released in orchestrationThe step to release plan order from Supplies Demand : Mark for release > save > release > the PLO release has been successful > schedule process > match the argument for… -
Ability to identify outlier corrected data pointsIn DM, is there a way to see which data points were identified as outliers and adjusted by the system? -
assembly item not exploded into components in constrained plan outputHi, we are running a constrained supply plan in oracle fusion using FBDI templates to upload data into the system. For demand schedule, we are using the sales order. Aft… -
Use forecasted planning percentages instead of collected data in Supply PlanSummary: I am bit confused, as there is not single page where we can see the latest setups and capabilities for CTO in DM and Supply Planning. I was going the the oracle… -
Sales Order Measure not showing value for Model ItemsSummary: We are having a CTO environment. We are trying to review Forecast consumption information in a table. I have added measures like Gross Forecast, Net Forecast an… -
How to use ASL(Approved Supplier List) Processing lead time for Statistical Safety Stock calculationSummary: Hi Team, We are implementing Unconstrained Supply Plan where we are using Statistical Safety Stock. We want to use the ASL(Approved Supplier List) for sourcing.… -
How can we see options forecast and its consumption in supply planning for CTO item?Summary: We are working on CTO/ Model items in planning so we are loading final shipments history and option shipments history file as input to Demand plan so forecast i… -
Buyer planning - what logic is used to propose the date of a consolidated order?Hi, in Buyer planning, if we consolidate two order with two different dates, what logic does the system use to propose the consolidated order date? Does it always propos… -
I need understand gaps in Production schedulingHi: I upload a word with a example, I don't undertad how calculate solve. Coud you help me. -
How To Prevent Production Gaps In Production Scheduling?Summary: The system currently tries to schedule WOs to meet SOs, but sometimes leaves gaps between them. A continuous production flow is needed. Content (please ensure y… -
Attribute-based netting rule building for linking work orders through an item EFFHi, Customer manufactures chemical products and the process is broke down into two work orders: a semi-finished bulk item 1+ finished goods items The finished good items… -
Organizations in different time zones impact the Supply PlanSummary: We are working with Oracle Supply Chain Planning (Supply Planning Cloud) in a global environment with multiple Inventory Organizations located in different regi… -
Moved: How to export entire data table in .csv or .zip format using Export Data Table Rest API in C…This discussion has been moved. -
production scheduling tool could look at the BOM's of the jobsSummary: can production scheduling tool could look at the BOM's of the jobs to be able to determine certain criteria for change overrule setup? Content (please ensure yo… -
Safety stock Calculation For MRP planned items in oracle cloudSummary: Our scenario is that we are using supply planning and we want to calculate safety stock using Days of cover method for my MRP planned items meaning they have de… -
Best way to handle Cannibalization in Demand ManagementSummary: One of our client is moving from Demantra DM to Cloud DM. They are using Demantra Cannibalization feature extensively. We would like to understand how do you ma…
-
User Defined Measure Unexpected BehaviorHi experts - hoping I can get some pointers on where to look to understand this behavior and fix the issue. We have a requirement to create a new measure called 'GVI DP_… -
Safety stock for components with Safety stock method as Days of cover not claculating by systemSummary: We have defined the safety stock calculation as User Specified Values for all items in the plan options under the supply plan. For finished goods, the safety st… -
Differences days of cover for safety stock dependent and independent item supply planningIs there a differences if I put safety stock days of cover for independent and dependent item ? what is the ouput ? I have safety stocks days of cover for our raw materi… -
Need Clarity on functionality of Forecast type in Avg Daily Demand and its calculation logic.Summary: In PIM, under Planning tab, we have three Forecast Type options for "Average Daily Demand Calculation". i.e, 1. Historical Sales 2. Order Forecast 3. Sales Fore… -
Enabling Naive Forecasting alters better forecasts we had without using it.Summary: We are perfecting the Forecast Profiles to obtain a better MAPE by changing some parameters. However, we need some explanation about a strange phenomena happeni… -
Confused by MetricsPeriod Parameter in Forecasting profile - Pls help.Summary: MetricsPeriod, according to whitepaper : Controls whether engine metrics MAPE, MAD, and Bias are generated as part of forecast run. Parameters values are number… -
Minimum Observations and Maximum Observations (Demand Management Forecasting Profile)Summary: While experimenting with those parameters in the Forecast Profiles during Forecast Tuning, we observed very different MAPE results with different parameters val… -
SUPPLY PLAN IN ERROR.Summary: The error says: ESS-07033 Job logic indicated a system error occurred while executing an asynchronous java job for request Content (required): Version (include … -
How is the Scheduled Receipt Date calculated for open Purchase Orders in the Material Plan ?Organization Name (Required - If you are an Oracle Partner, please provide the organization you are logging the idea on behalf of): Description (Required): We are trying… -
MAPE and MAD manual calculations are not matching with Demand PlanSummary: Demand Plan is in monthly buckets. Manual Calculation values MAPE: 0.258 MAD: 7.76951833 System calculation values MAPE: 0.453 MAD: 78.15886 I have highlighted … -
How to Consider storage tank capacity in supply plan.How to Consider storage tank capacity in supply plan while generating planned order recommendation or reschedule recommendation. Client is looking for following function…