To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Supply Chain Planning
Supply Chain Planning and Collaboration
Discussion List
-
Include Item's DFF and EFF in simulation setHi, is possible to include in a simulation set the Item's DFF and EFF ? it would be helpful for searching and find the correct item when the simulation set contain a lot… -
Hyperparameter Tuning: Tuned Setting measureSummary: We are running the demand plan with Hyperparameter Tuning mode enabled, HypertuneSamplePercent set to 100% and HypertuneOutputMode set to Tune and Compare. Look… -
Seeking Guidance on Implementing Location-Based Access Control (LBAC) in Oracle CloudSummary: Hi All, I am reaching out to inquire if anyone have implemented or are currently utilizing the Location-Based Access Control (LBAC) feature in Oracle Cloud. If … -
Replenishment | Convert transfer order suggested by plan to Purchase orderHi, we have a replenishment plan at subinventory level. Based on the sourcing rules and assignment set, the system generates transfer or purchase orders. (the transfer o… -
Required a document/white paper for shutdown scenarioSummary: we require any Document or white paper for a scenario explained below; we are running a constrained supply plan using FBDI Templates to upload data in fusion. w… -
How to setup Priority for Alternate item-structure selection in Constraint supply planSummary: I understand that production priority can be setup at work definition level and it can be used to pick an alternate work definition, BUT is there a way to do th… -
How system is distributing WO operations within multiple resource units in Production schedule?Summary: We are seeing that Production Schedule is distributing parallel work order operations between resource units by it's own when there are multiple resource units … -
Unable to load shipment history to Collected measure dataSummary: I am trying to load the shipment history for an item with or without demand class values. While trying to load the FBDI , initially all records kept failing wit… -
Supersession relationship in Unconstrained Supply Plan - Need clarificationAs per below Oracle Document, created Supersession relationship between two parts. Part A superseded by Part B at item level in Product Hub. Noticed three issues in Unco… -
Can Oracle Demand Management calculate forecasts concurrently across levelsSummary: OpenQuestion Can Oracle Demand Management calculate forecasts concurrently acrosslevels 4, 5, and 6 within the same hierarchy, in the same plans and if not,what… -
Constrained Planned Orders not considered by Replenishment Plan on Multi-echelon Planning setupSummary: Constrained Planned Orders not considered by Replenishment Plan on Multi-echelon Planning setup with Constrained Supply Plan Problem Statement: We are using Ora… -
How to Extract "Shipments Receipt History" file data From EBSWe integrate Oracle EBS with Oracle Supply Chain Planning (SCP) Cloud and are using the "Extract Data for Oracle Supply Chain Planning Cloud" concurrent program to extra… -
Ask EBS for ASCPSummary: Could someone please advise when will Oracle release Ask EBS for ASCP (Advanced Supply Chain Planning) Content (please ensure you mask any confidential informat… -
Should Lock Status in Backlog Management be maintained for a sales order through replanning?I have read that I can set the Lock Status on an order line in backlog and it will maintain as locked while running a plan, and still show as locked after the plan runs.… -
Which Supplies considered the first priority to calculate the Total supplies is it a PR or PO or TO.Summary: In Our case there is a PR in the month of August. However we have a TO which are unfirm in the month of July. However, for fulfulling the Internal demand system… -
Creating a quarterly PO with weekly releases (catalogue items)Hi all! We use Oracle Fusion Procurement and Supply Planning modules. We are looking to create a quarterly blanket purchase order that has weekly releases but doesn't re… -
How to "transfer" the shipment history from one item to anotherHi, we currently have several items that identify the same type of product but are supplied by different suppliers. For example, item 1 is the syringe supplied by suppli… -
How to have Backlog Management not suggest date updates to sales orders with manual overridden datesSummary: How to have Backlog Management not suggest date updates to sales orders with manual overridden dates Content (please ensure you mask any confidential informatio… -
Document with the explanation of all the columns present in Supplies and Demand Table in Supply PlanLooking for a document with the explanation of all the columns present in Supplies and Demand Table in Supply Plan. Example : Original Item Quantity Original Order Quant… -
how make type planned order is deriving the suggested order date in unconstrained supply planSummary: Hi Guru, we are running the unconstrained plan and system is suggesting a planned make order with a suggested start date we cannot understand. there is an sales… -
Is there a way to restrict Return Transfer Order getting collected in planningReturn Transfer Order is getting collected in planning and showing up as Transfer Order demand causing issues with Supply planning.Is there a way to restrict Return Tran… -
Not able to view resource and product hierarchy dimension togetherWe have a requirement that we want to view material plan output based on Oraganization,resource,product filter.But we are not able to view the material plan measures usi… -
SP Gannt with colors green and yelowHi: Gannt show one resource with color green and Yellow. Could someone clarify why? I don't find any información about this. Thanks a lot María -
DM: In "Demand Collaboration", can we select an aggregated demand plan that excludes the customer?Summary: In "Demand Collaboration", can we select an aggregated demand plan that excludes the customer or the customer site? Oracle Reference Links: Why You Use Demand C… -
Plant is running full load, but PS doesn't show thatSummary: Plant is running full load, but PS doesn't show that picture Equipment utilization below 15% and resource utilization below 3% What is the driver of this issue … -
MPS in Supply PlanningSummary: Our customer is currently using EBS 11i10 MS/MRP and is in the process of implementing Supply Planning. Currently, they use the MPS to plan and procure long lea… -
Not able to sort based on planning attribute in demand priority ruleWe defined planning attribute(Netting) with value set (Table ) and assigned the planning attribute to Demand priority rule as attribute.But not able to perform sorting w… -
Oracle Fusion Planning – Clarifying and Modeling “Space Constraints”In Oracle Fusion Supply Planning / Production Scheduling, material and resource capacity constraints are handled natively. When business users mention a “space constrain… -
Time bucket aggregation in weeks and Period in supply chain collaboration exportWe are looking to interface order forecasts to the respective suppliers via an integration from Supply Chain Collaboration. When we ran the Export Collaboration Order Fo… -
how to add attributes in levels and attributes planning analytics outside the LOVHi experts, we have requirement to have attributes showing in material plan (showing every item based on the same attributes) hence using the advance filters in selector…