Discussions
Join us for complimentary one-day events around the world and step into a future fueled by AI and limitless potential. Explore new breakthroughs, sharpen your skills, and connect with experts who are shaping what’s next. Experience bold keynotes, interactive learning, and connections that span the global NetSuite community. Discover what's next at SuiteConnect Tour 2026.
Have questions or experiences to share? Post your Release 2026.1 questions and join discussions in the Release 2026.1 category.
Intelligent Payment Automation, powered by BILL (formerly Bill.com), lets you automate payments, manage vendor details, and bank account information within NetSuite.
The SuiteApp is available to organizations based in the U.S. with a valid U.S. address, or to global customers (except Canada, China, and Japan) with U.S. business subsidiaries. It only supports payments to vendors operating in the United States.
For more information, visit this thread.
Need help with a report or Saved Search to show overall cost of BOMs
Team,
Thanks in advance for taking the time to help me or read this.
We are in the process of implementing Netsuite and have most of our components, sub assemblies and finished good assemblies loaded into Netsuite. We are using the Average Costing Method. I've come to find out that using anything other than a Standard Costing Method means that I can't run a Costed Bill of Material Report. So I'm stuck trying to accomplish this with a Saved Search or some other method.
I'll be honest, I know very little about ERP systems. We hired a consultant to assist us, he build the system part way with us and then bailed on us. I'm struggling to teach myself and make heads or tails of the system and finish it so we can utilize it. I think I've done pretty good but I'm stumped on how to get overall Bill of Material Costs from a saved search. I was able to go in a start an assembly build and it gave me a projected value, however the projected value only takes into account components