What constraints does PS take into consideration while scheduling WO?
Summary:
Hello,
In our production schedule, we have defined some item EFF based changeover rules. We have setup A,B,C classification as the item EFF, and the change over rules are defined in a way where A to B changeover, and A to C changeover are in the top of the sequence (10,20). Also changeover time for these two is higher than others.
How does PS schedule the WO based on these? Does it group all the A class item and finish its processing first before moving to B class to minimise changeover? What are the parameters that the PS system considers when scheduling WOs incase change over is defined?