Hello Everyone,
I have couple of DataSyncs (from BSO to ASO) running in parallel. The load sometimes fail because the load buffer is not released while the second datasync requests for load buffer. I checked that the DataSync by default is creating a load buffer with resource_usage as(1). Is there anyway i can change the default behavior of DataSync to create load buffers with 0.25 or 0.5 resource_usage? This way i can allow parallel DataSyncs..
The error i get currently is
Cannot end dataload. Essbase Error(1270095): Specified load buffer resource usage [1] is above currently available value [0]
0