While using standard costing. How can I make changes in published Item's cost.
Summary:
Want to be able to change published Item's standard cost in future so that all transaction must get adjusted according to new cost of Item.
Ex. A firm publish a cost scenario with 10 Item's standard cost on 1st Jan, after six month (1st July) they decide to edit standard cost of 5 Items in same scenario so that all the transactions happened in the meantime should get updated cost. How can I achieve this in standard costing?
Content (required):
Version (include the version you are using, if applicable):
23C
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged: