Preventive Maintenance
Discussion List
-
post refresh jobsSummary: Since we have been switching on Redwood Functionality, we have to run a list of post refresh jobs. However jobs take a very long time and we're checking whether…Honor Robins 17 views 1 comment 0 points Most recent by Deaconu Constantin Valentin-Oracle Human Capital Management
-
Do we have Maintenance work order approval based on Inventory Materials (Item) used?Summary: Currently we do not have any approvals for Maintenance work orders. Now, we are trying to bring in approvals by e-signature for Maintenance Work orders. However…
-
How can I configure suppression for below scenarioSummary: How do I configure suppression for day-based work requirements where one has a 60-day interval and the other has a 90-day interval? Both work requirements have …
-
Maintenance Work Order Approval WorkflowI navigated in "Manufacturing and Supply Chain Materials Management" and went to the task "Configure Electronic Signature Preferences". I added the inventory organizatio…
-
Maintenance of Powerlines and PipelinesWe want to discover the capabilities of Oracle Maintenance cloud. Does Maintenance Cloud support Maintenance of Powerlines and Pipelines which are thousands of miles lon…
-
How to transfer maintenance cost to Associated Fixed Asset?Summary: Is there a way to transfer the Maintenance Cost to the Fixed Asset associated with the Maintenance Asset. I could see in the Implementation guide but there is n…
-
Kitting and Dekitting with MaintenanceSummary: Hi All, We would like seek support on the below requirement , Whenever we perform a maintenance activity on an Asset which is actually a Kit (Probably a turbine…
-
Manage Coverages - Repair Transaction CodesWhen creating a Coverage in the maintenance module, would the "Repair Transaction Codes" field refer to the "components" of a distinct asset that may be covered by the w…
-
I can execute work orders in mfg, though the asset resource instance has open mnt work orderSummary: Hi experts, A) I have an asset A1 which is linked to a work center. B) There is a resource in manufacturing R1 whose instance is linked to asset A1. C) I have a…
-
Shift Schedules changed in plant parameters of maint org does not generate forecastingSummary: We have shift schedule marked as monday to friday timing 08:00am to 05:00pm and under standard operation resource assignment we have marked scheduled as YES so …
-
Asset hierarchy was not created in Install Base for a Kit Item after SO shipmentSummary: We have a kit item shipped out of inventory .As per business both parent and child items are inventory items with serial numbers.We are expecting that asset hie…
-
The status of the work order is not getting changed in my maintenance workSummary: We are newly testing the 'My maintenance work bench' and found that the work order competled from this form is not updating the status immidiately. and the same…
-
is it possible to associate a Supplier warranty with PO?Summary: Hello All, Im currently wondering if there is a relation between supplier warranty in maintenance and PO, customer wants when purchasing an Item to have it's wa…
-
PM Work Order Due DateSummary PM Work Order due date that is separate from the planned completion date.Content Our business users are having trouble with Preventive Maintenance Work Orders sh…
-
Fusion Maintenance - How to add anew lookup values of maintenance resource type fieldSummary: Hi , How do I add the new values on the lookup maintainance resource type values?Balaji Midhun Kumar Sanagapalli-146903 10 views 1 comment 0 points Most recent by SRGogula-Oracle Maintenance
-
how to know all Index Name to Reingest in a single place based on the formSummary: Hi All, As we see so many responsive UI pages are getting introudced release by release, is there any way we can know all the prerquisites like profile options,…
-
Outsourced Work Orders inquirySummary: I am working with a client who intends to implement Oracle Fusion Maintenance for managing their assets. However, the client will not be performing maintenance …
-
Unable to create Maintenance WO in Help deskWe have a requirement wherein users create Work Request in Help Desk. The Maintenance Manager then reviews these Work Request and create a Work Order for it. But in our …
-
Meter Based Preventive plan for meter with irregular readings or intervalsSummary: We have a business requirement where we need to create a meter-based preventive maintenance plan, but challenge is the meter intervals are at different frequenc…
-
Need clarity on additional licenses required for using the Help Desk work requests featuresSummary: In the Implementation Guide document, it is mentioned that - To submit a Work Request for an Asset, you don't need any additional subscription. However, to mana…
-
When adding Supplier operation facing error The work order is marked for out-of-sequence completion.Summary: When adding Supplier operation facing error The work order is marked for out-of-sequence completion. Content (please ensure you mask any confidential informatio…
-
Unable to Import Failure Set via FSMSummary: we have client requirement to enter around 2000+, "failure chain" combinations in single failure set. But currently when we try to import them via Functional se…
-
After Work order completion need to notify to production/manufacturing teamSummary: Hello team, Is there any option to create a notification when Maintenace work order is completed or closed? There is a requirement where the business needs to s…
-
Can you change work order sub type which is generated by preventive maintenance programSummary: Can you change the work order subtype that is generated by the preventive maintenance program? The work order generated has a subtype of 'Planned.' Can we chang…
-
Restrict the creation of Work Order for an asset which is having open work orderSummary: Hi Team, We have a business requirement to restrict the user from creating a Work Order for an Asset that already has an Open Work Order. For Example: A user ha…
-
Unable to release project driven maintenance work orderSummary: Hi Team, We are trying to link a project/task to a maintenance work order and release it. But we are facing the below error which is restricting us to release i…
-
What is the replacement for Internet of Things (IoT) in Maintenance Assets Monitoring?Summary: It was understood that Internet of Things (IoT) is going to be replaced with another service. Although we are not sure about the exact details and plan from Ora…
-
Mass create failure SetsHi. Is there any way to mass create failure sets? I found this REST API but I couldn't build a payload to test it in postman /fscmRestApi/resources/11.13.18.05/assetFail…
-
is it possible to create corrective maintenance work order based on meter readingsSummary: Hi Team, We would like to explore more on the functionality of generating a Maintenance work order based out of Meter readings, We do understand that ,With mete…
-
Preventive Maintenance Program Calendar Visibility with Supply Chain Planner (Planning module)Summary: Hello All We have a requirement to ensure that the Preventive Maintenance program calendar is visible or shared with the supply chain planner, so all relevant s…